Steel Structure
home Application Aircraft Hangar

Airport Far Flight Terminal Project

Xianyang Airport Terminal Design Detail 01
Xianyang Airport Terminal Design Detail 04
Xianyang Airport Terminal Design Detail 05
Xianyang Airport Terminal Design Detail 03
  • Area 1.12 million ㎡
  • Warranty 50 years
  • Roof color steel sheet
  • Anti-rust treatment galvanization

Advantage

Aircraft Hangar Project Airport Solutions
  • 80% of production can be finished at factory

  • Easy and fast installation

  • Cost-effective

  • High security

  • Roof and side enclosures can be installed on the ground and lifted successfully once

The most specific advantages of this project is Environmental- friend. Green energy conservation is a comprehensive challenge in large-scale terminal building.Because the front facade of the main building is very long, if the height of the main building is simply lowered to reduce the volume of the interior to reduce energy consumption, the proportion of the building will be out of balance, unable to reflect the role of the city portal sign.On the other hand, several of the largest airports in China have adopted high curved roofs structure in the middle in order to reflect the grandeur of the city gateway, but they are high and useless in function, and on the contrary, they greatly increase the energy consumption of the interior space.

Get Free Project Quote