Dapeng Town Industrial Park, Tongshan District, Xuzhou City, Jiangsu Province, China
The structure of this logistics warehouse is steel structure + reinforced concrete frame structure and steel structure truss roof structure. The building has a basement level and consists of 9 units. Each unit is equipped with a small kitchen and toilet. When designing and producing, it is important to consider that the ground is inclined at 30 degrees, and the wind resistance level is designed to be 137km/h according to customer requirements. When installing roof truss beams with a span of 41 meters, two cranes need to be activated for simultaneous operation.
This project has a large span and large column spacing. Considering the difficulty of high structural component load requirements, our steel structure warehouse design and construction team specially designed lattice columns for the main column of the plant to strengthen the main body’s bearing capacity and ensure the safety of the entire steel structure plant. Sex. Regarding the difficulties of this project, our company has assembled the company’s design strength, worked hard to solve the problem, deepened the drawings, thought about what the customer thought, evaluated by the specialized technical team, and designed a plan suitable for actual needs. The detailed technical inspections eliminated the complex connections, multiple nodes, high design requirements, and short installation time of the steel structure prefabrication, and completed all the production problems efficiently. Using the deep prefabrication construction technology of steel structure, the steel structure components are prefabricated in its own factory, which greatly improves the installation efficiency. And relying on years of export loading and overseas construction experience, the components are safely delivered to the customer’s location in batches in an orderly manner, and engineers with strong skills and practical experience are assigned on-site guidance to achieve a seamless connection of technology, production and installation. The owner requested the delivery on time and the installation was completed.