Dapeng Town Industrial Park, Tongshan District, Xuzhou City, Jiangsu Province, China
80% of production can be finished at factory
Easy and fast installation
Cost-effective
High security
Roof and side enclosures can be installed on the ground and lifted successfully once
The steel structure logistics center warehouse project covers an area of 108,000 square meters, with a total construction area of 87,572.1 square meters, including 8,684.4 square meters above ground and 722.7 square meters underground. The construction area of the first phase is about 54,000 square meters.