The space frame company often encounters a lot of bad weather during the construction and installation of the space frame. In this environment, we cannot stop the construction of the space frame because of the unsatisfactory environment. Therefore, we should pay attention to some problems during construction in a lot of rainy weather.
The space frame company needs to pay attention to the space frame construction in inclement weather, so how does the company carry out the construction in the inclement weather?
- Space frame construction In rainy weather, the components cannot be painted.
- When the space frame project is constructed in rainy weather, it is advisable to set up a temporary protective shed, and the rainwater shall not fall on the hot weld. If the welding part is wet, it must be wiped with a dry cloth and dried with an oxyacetylene flame before welding to keep welds are dry and there is no residual moisture.
- As the air is relatively humid in rainy days, the storage of welding rods should be moisture-proof and baked. The number of repeated baking of the same welding rod should not exceed twice, and the management personnel should make a baking record in time.
- In case of gale weather during the construction of the space frame,large components such as columns, main beams, and supports should be corrected immediately. After the position is corrected, they should be permanently fixed to prevent unilateral instability.The components installed on the same day should form a space stable system.
- Roof insulation construction cannot be carried out on rainy days and strong winds above level 5.
- During the hoisting of the space frame structure in rainy days, if there is water on the components, it should be cleaned up before installation without damaging the coating. When the high-strength bolt joints are installed, the friction surface of the components should be clean without water droplets, rain and contact with dirt, oil and other dirt.
The above are the items that the space frame company needs to pay attention to when the construction is carried out in inclement weather.