The steel structure workshop has the characteristics of short construction time, low cost and practicality. There are several influencing factors below.
The first one: Steel structure raw materials are factors that directly affect the cost of steel structure workshops. The second one: Design is also a large part of the factors that directly affect the price. The steel structure project plan design is designed by professional designers, so that the plant plan can be reasonable. Reasonable design is the fundamental issue of saving raw materials and controlling the cost of steel structure engineering. Different steel structure engineering designs and plans are important reasons that affect the weight of raw materials and directly affect the cost of steel structures.
The basic cost is closely related to the geology of the location. The basic construction period accounts for about 25% of the total construction period of the plant, and the basic cost is 15% of the total cost. 1. The crane lifting weight is greater than or equal to 25 tons. It can be considered as a structure, 2. The amount of steel used per square meter is greater than or equal to 50KG/M2. It can be considered as a structure, 3. The thickness of the main component steel plate is greater than or equal to 10MM, and light steel structure is less used. Membrane structure carport manufacturers, in addition. There are also some reference values such as the cost per square meter. The weight of large components, large spans, structural forms, eaves height, etc., can provide empirical data when judging whether the factory building is made of light steel or not. Of course, many buildings are now light and all. But some we can say are such as petrochemical plants and facilities, power plants, large-span stadiums, exhibition halls, and high-rise or high-rise steel structures.